
History
Provide a comprehensive welding solution for solar modules

2004
The first batch of tin-coated copper strips was successfully developed in Shenzhen, and volume supply began in the same year;


2007
The company's strategic adjustment, moved from Shenzhen to Wuxi, established Wuxi Sveck Technology Co., Ltd. in Wuxi, and passed the ISO9001: 2000 quality system certification of BSI;


2009
SVECK and Harbin Institute of Technology cooperate to establish an engineering technology research and development center;


2011
Obtained the “provincial high-tech enterprise” certification, and at the same time set up a project team for “research and application of extremely soft tin-coated copper strip for solar photovoltaic cell module connecting materials”;




2006
The company's products have been recognized by Suntech, a leading domestic solar energy company, and have begun to cooperate;


2008
“SVECK” super soft tin-coated copper strip was successfully developed and became the market leading product;


2010
Sveck, together with the Ministry of Industry and Information Technology and the National Photovoltaic Testing Center, led the drafting of the national standard for “photovoltaic tin-plated ribbons”;


2012
Independent research and development of fully automatic production lines, automatic, intelligent and systematic production mode, product quality is more stable and reliable;